Starbucks Coffee 

Project Type: Ground-Up Building

SQ FT: 2,100

Project Year: 2017

Overview: Site Work and Ground-Up Building

Scope of Work: Conversion of a vacant lot, that was previously a gas station.

Site Improvements Included: Excavation, drainage systems, geo pier installation, specialized vapor barrier, soil testing, foundation, grading, paving, landscaping, and dumpster corral addition.

Building Shell Improvements: Brick façade built, exterior signage, drive-thru installation.

Interior Improvements: Construction of rough framing, rough plumbing, rough electrical and rough gas installation to make ready for the tenant build-out.

More PhotosBack to Projects

Starbucks Coffee

LaPorte, IN

Starbucks Coffee

LaPorte, IN

Starbucks Coffee 

Project Type: Ground-Up Building

SQ FT: 2,100

Project Year: 2017

Overview: Site Work and Ground-Up Building

Scope of Work: Conversion of a vacant lot, that was previously a gas station.

Site Improvements Included: Excavation, drainage systems, geo pier installation, specialized vapor barrier, soil testing, foundation, grading, paving, landscaping, and dumpster corral addition.

Building Shell Improvements: Brick façade built, exterior signage, drive-thru installation.

Interior Improvements: Construction of rough framing, rough plumbing, rough electrical and rough gas installation to make ready for the tenant build-out.

More PhotosBack to Projects

Chicago Office

3400 W. Stonegate Blvd., Ste #2130
Arlington Heights, IL 60005

Denise Arreola

Vice President of Operations

darreola@elevatedconstructioninc.com

847-207-4296

Dallas Office

8330 LBJ Freeway Suite #525
Dallas, Texas 75243

Matthew Maleski

Project Executive

mmaleski@elevatedconstructioninc.com

469-779-7391